Supply and extract ventilation systems were installed in the shower blocks of Wings B and E, along with a combination of wet and electric heater batteries. The entire system was fully integrated into the existing Building Management System (BMS), including new head-end graphics.
PMA has a long-standing history of the delivery of high-quality shower refurbishment programmes within the MOD and MOJ estate, having delivered over 200 shower block refurbishments during our tenure.