HMP Standford Hill

Project-Ensuite Refurbishment 

Duration – Commenced February 2021, 3 phases at 12.5 weeks per phase

Approx. value – £2.9 million

Project Details

Between February 2021 and May 2021, we installed 64 Nr sleeper units at HMP Standford Hill for GFSL at a cost of £2.9 million.

The auxiliary units included double servery, double self-cook, double office and WC, single laundry, single pin phone and store units.

We also upgraded 20 Nr temporary Covid-19 sleepers into permanent placement arrangement.

 

We conducted the following works and installed 64 MUDR permanent sleeper units-

  • Installed automated gate entry.
  • Installed hardwired fire alarms.
  • Installed CCTV throughout.
  • Installed digital TV to all sleeper units.
  • Installed permanent power and linked all underground services to the main sewer.

Project Summary

HMP Ford

Project-80 Nr sleeper units

Duration – Commenced February 2021 for a period of 8.3weeks

Approx. value – £2.6 million

Project Details

From February 2021 for a period of approx.8.3 weeks, we conducted, and we installed 80 Nr sleeper units at HMP Ford for GFSL at a cost of approx. £2.6 million.

 

We conducted the following works as part of the project: –

  • We installed 80 permanent sleepers, 4 ambulant accessible sleepers, 2 single kitchens, 2 single laundries, and 2 single pin phones.
  • Installed CCTV and external lighting throughout.
  • Connected the underground drainage to the main sewer.
  • Installed digital TV.
  • Installed hardwire fixed fire alarms.
  • Undertook extensive external landscaping.

Project Summary

HMP Wandsworth

Project 2 Nr safety cells

Duration – Commenced March 2020 to June 2020

Approx. value – £210,000.

Project Details

From March 2020 for a period of approx. 13 weeks, we altered and adapted the existing standard cells into compliant safer cells at a cost of approx. £210,000.

 

We conducted the following works as part of the project: –

  • Installed safer cells Corian beds and Corian WCs and basins.
  • Installed NOMS-approved safer cell windows.
  • Installed anti-ligature cell door shrouds to all exposed pipework to ensure that the cells are anti-ligature compliant.
  • Fitted safer cells face plates to cell core and light switches.
  • Installed anti-leg safer cell replacement light fittings.
  • Used resin floor coverings.
  • Decorated the walls and ceilings.

Project Summary

HMP/YOI East Sutton Park

Project – Temporary accommodation portacabins

Duration – Commenced June 2020 and ended September 2020

Approx. value – £250,000

Project Details

From June 2020 for a period of approx. 13 weeks, we installed temporary accommodation portacabins at HMP East Sutton Park at a cost of approx. £250,000.

 

In response to the Covid-19 outbreak the MoJ sourced and purchased a number of individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

 

We conducted the following works as part of the project: –

  • Installed temporary generators to provide power.
  • Provided water and wastewater connections.
  • Installed external lighting.
  • Fitted the sleeper accommodation with bedding, furniture, and desks.

Project Summary

HMP The Verne

Project -Temporary accommodation portacabins 

Duration – Commenced Between June 2020 and September 2020

Approx. value- £189,000.

Project Details

From June 2020 for a period of approx. 13 weeks, we installed temporary accommodation portacabins at HMP The Verne at a cost of approx. 189,000.

 

In response to the Covid-19 outbreak the MoJ sourced and purchased several individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

 

We conducted the following refurbishment works: –

  • Installed temporary generators to provide power.
  • Provided water and wastewater connections.
  • Installed external lighting.
  • Fitted the sleeper accommodation with bedding, furniture, and desks.

Project Summary

HMP Huntercombe

Project – Temporary accommodation portacabins

Duration – Commenced between June 2020 and September 2020

Approx. value – £155,000

Project Details

From June 2020 to September 2020, we conducted temporary accommodation works at HMP Huntercombe at a cost of approx. £155,000.

 

In response to the Covid-19 outbreak the MoJ sourced and purchased a number of individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

 

We conducted the following refurbishment works: –

  • Installed temporary generators to provide power.
  • Provided water and wastewater connections.
  • Installed external lighting.
  • Fitted the sleeper accommodation with bedding, furniture, and desks.

Project Summary

HMP Guys Marsh

Project – Temporary accommodation portacabins

Duration – Commenced between June 2020 and September 2020

Approx. value – £217,000.

Project Details

From June 2020 for a period of approx. 13 weeks, we installed temporary accommodation portacabins at HMP Guys Marsh at a cost of £217,000.

 

In response to the Covid-19 outbreak the MoJ sourced and purchased several individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

 

We conducted the following refurbishment works: –

  • Installed temporary generators to provide power.
  • Provided water and wastewater connections.
  • Installed external lighting.
  • Fitted the sleeper accommodation with bedding, furniture, and desks.

Project Summary

HMP Birmingham

Project – NHS Health care

Duration – Commenced January 2020 for a period of 8 weeks

Approx. value – £55,000

Project Details

From January 2020 for a period of approx. 8 weeks, we completed a health care dental project at HMP Birmingham at a cost of £210,000.

 

We altered and adapted an existing office, converting the area into an NHS-compliant dentist in-establishment facility.

 

We conducted the following refurbishment works: –

  • Installed an NHS-compliant ventilation and comfort cooling system.
  • Installed hygienic wall and floor finishes.
  • Installed a bespoke dental chair.
  • Installed Corian hygienic NHS standard worktop and cabinets.
  • Installed new water and dental compressed air services.
  • Upgraded the electrical services to accommodate an X-ray machine.

Project Summary

HMP Wormwood Scrubs

Project – Cell conversion

Duration – Commenced from January 2020 to March 2020.

Approx. value – £138,000

Project Details

From January 2020 for a period of approx. 8 weeks, we undertook an adapted equality cell conversion and holding room alteration at HMP Wormwood Scrubs at a cost of £138,000.

 

We conducted the following works as part of the project: –

  • Altered and adapted 2 existing standard cells.
  • Widened the cell entrance doors to comply with the Equality Act standards.
  • Levelled the floors.
  • Converted 1 cell into an accessible wet area and WC.
  • Installed new cell call and accessible alarm systems.
  • Installed new accessible bed and furniture.
  • We were awarded it with five weeks to go until the year-end. It was successfully completed on time.

Project Summary

HMP Wormwood Scrubs

Project – Cell wing refurbishments 

Duration – Between July 2018 and December 2018

Approx. value – £475,000

Project Details

Between July 2018 and December 2018, we undertook 104 cell wing refurbishments at HMP Wormwood Scrubs for the MoJ at a cost of £475,000.

 

We conducted the following refurbishment works: –

  • Isolated all the services.
  • Stripped away all the vinyl flooring.
  • Removed furniture.
  • Repaired windows, electrical lights and cell calls that were in a state of disrepair.
  • Refurbished the wing shower.
  • Laid new vinyl flooring throughout.
  • Decorated cells, walls, and ceilings as well as the main landing and association area.
  • Conducted a deep clean throughout.

Project Summary

HMP Birmingham

Project – Extension to the CSU wing 

Duration – Commenced from May 2019 to October 2019

Approx. value – £ 350,000.

Project Details

From May 2019 for a period of approx. 21 weeks, we conducted undertook an extension to the CSU wing at HMP Birmingham for the MoJ at a cost of £350,000.

 

The work was undertaken in a live environment and included out of hours and weekend work. It involved installing security hoardings to facilitate the work.

 

We conducted the following works as part of the project: –

  • Undertook extensive cell refurbishment.
  • Installed new cell doors.
  • Installed 2 new wing showers.
  • Removed a structural staircase.
  • Installed a new secure mesh ceiling.
  • Laid new vinyl flooring throughout main association area.
  • Upgraded staff mess room.
  • Upgraded wing CCTV.
  • Introduced new GA buttons.

Project Summary

HMP Send

Project- Refurbishment of a mess cafe

Duration – Commenced from March 2019 to May 2019

Approx. value – £124,000.

Project Details

From March 2019 for a period of approx. 8 weeks, we undertook the refurbishment of a mess cafe at HMP Send for the MoJ at a cost of £124,000.

 

We conducted the following works as part of the project: –

  • Laid vinyl and carpet throughout.
  • Decorated throughout.
  • Formed a new hygienic kitchen area.
  • Upgraded the LED lighting system.
  • Altered male, female and DDA toilets.
  • Installed new kitchen cabinets.

Project Summary

HMP Winchester

Project – Reinstatement of Wing B at HMP Winchester

Duration – Commenced from August 2019 and September 2019

Approx. value – £ 150,000.

Project Details

Since August 2019, we undertook the reinstatement of Wing B at HMP Winchester for HMP at a cost of approx. £150,000.

 

We have conducted the following works as part of the project: –

  • Completely cleaned the wing and stripped it back to its original state.
  • Made structural repairs.
  • Introduced mesh and render finishings.
  • Repaired brickwork.
  • Redecorated throughout.

Project Summary

HMP Wormwood Scrubs

Project -Reinstatement of Wing B at HMP Winchester

Duration – Commenced from August 2019 to September 2019

Approx. value – £ 150,000.

Project Details

From August 2019 for a period of approx. 4 weeks, we reinstated NOMS-approved secure and compliant security ceilings at HMP Wormwood Scrubs for GFSL at a cost of £68,000. During a routine survey it was discovered that the ceilings were non-compliant and provided a security breach problem. We installed NOMS-approved secure and compliant ceilings out of hours to keep the area in operation.

Project Summary

HMP Wandsworth

Project – Seg reinstatements 

Duration – Commenced October 2020 for a period of 13 weeks.

Approx. value – £70,000.

Project Details

From October 2020 for a period of approx. 13 weeks, we undertook seg reinstatements work at HMP Wandsworth for GFSL at a cost of £70,000.

 

We conducted the following works as part of the project: –

  • Decorated cells.
  • Upgraded lighting.
  • Laid new vinyl flooring.
  • Used anti pick mastic joint sealant throughout.
  • Installed heating pipe shrouds.
  • Installed new furniture throughout all cells.
  • Conducted a refurbishment to specialist holding and search cells.
  • Conducted a part refurbishment of the shower area to ensure hygiene standards.

Project Summary

HMP Wormwood Scrubs

Project – Nr showers 

Duration – Commenced from September 2020 to March 2021

Approx. value – £220,000

Project Details

Since September 2020, we installed 5 Nr showers at HMP Wormwood Scrubs for GFSL at a cost of £220,000.

 

We have conducted the following works as part of the project: –

  • Isolated services.
  • Stripped out redundant fixtures and fittings where needed.
  • Laid new resin floors.
  • Installed new stainless steel aco drains.
  • Installed new LED lighting.
  • Installed new Trespa cubicle panels, stainless steel cubicles and new Rada showers.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP/YOI Chelmsford

Project – 38 cell refurbishments at HMP Chelmsford

Duration – Commenced from August 2018 to Januaryv2019

Approx. value – £ 300,000.

Project Details

Since August 2018 for a period of 21 weeks, we undertook 38 cell refurbishments at HMP Chelmsford for the MoJ at a cost of approx. £ 300,000.

 

We have conducted the following works as part of the project: –

  • Isolated services
  • Stripped away all the vinyl flooring.
  • Removed furniture.
  • Repaired windows, electrical lights and cell calls that were in a state of disrepair.
  • Refurbished the wing shower.
  • Laid new vinyl flooring throughout.
  • Decorated cells, walls, and ceilings as well as the main landing and association area.
  • Conducted a deep clean throughout.

Project Summary

HMP Wandsworth

Project – Nr shower refurbishments at HMP Wandsworth

Duration – Commenced from January 2020 to June 2020

Approx. value – £300,000

Project Details

From January 2020 for a period of approx. 21 weeks, we undertook 5 Nr shower refurbishments at HMP Wandsworth for GFSL at a cost of £300,000.

 

We conducted the following refurbishment works: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains and resilient porcelain wall tiles.
  • Used new resin floor coverings and hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Rochester

Project – Refurbishment of a high-spec shower

Duration – Commenced November 2018 for a period of 8 weeks.

Approx. value – £89,000

Project Details

From November 2018 for a period of approx. 8 weeks, we undertook the refurbishment of a high-spec shower at HMP Rochester for the MoJ at a cost of £89,000.

 

We conducted the following refurbishment works: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Laid new resin flooring.
  • Installed hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Wormwood Scrubs 

Project – Nr shower refurbishments 

Duration – Commenced January 2020 for a period of 21 weeks.

Approx. value – £110,000

Project Details

From January 2020 for a period of approx. 21 weeks, we undertook 2 Nr shower refurbishments at HMP Wormwood Scrubs for GFSL at a cost of £110,000.

 

We conducted the following refurbishment works: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Used new resin floor covering and hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP/YOI Brinsford

Project – Shower rooms 

Duration – Commenced December 2022 for a period of 8 weeks.

Approx. value – £125,000

Project Details

From February 2019 for a period of approx. 8 weeks, we created 2 new shower rooms at HMP Brinsford for the MoJ at a cost of £125,000.

 

We conducted the following refurbishment works: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Used new resin floor covering and hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Wandsworth 

Project – New equalities act compliant accessible showers.

Duration – Commenced November 2018 for a period of 8 weeks.

Approx. value – £45,000

Project Details

From November 2018 for a period of approx. 8 weeks, we created new equalities act compliant accessible shower at HMP Wandsworth for the MoJ at a cost of £45,000.

 

We conducted the following works as part of the project: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Laid new resin flooring.
  • Installed hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP/YOI Feltham

Project – Altered and Adapted an existing wing. 

Duration – Between April 2020 and June 2020

Approx. value – £159,000

Project Details

Between April 2020 and June 2020, we altered and adapted an existing wing at HMP/YOI Feltham for GFSL to make it suitable for use as an ESU wing at a cost of £159,000.

 

We conducted the following works as part of the project: –

  • Redecorated individual cells.
  • Installed electro-chromatic doors.
  • Upgraded association areas.
  • Refurbished wing offices
  • Upgraded and refurbished wing showers.

Project Summary

HMP Wormwood Scrubs

Project – Specialist security gates

Duration – Commenced December 2018 to February 2019

Approx. value – £30,000

Project Details

Between December 2018 and February 2019, we installed new specialist security gates at HMP Wormwood Scrubs for the MoJ at a cost of £30,000.

 

As part of the project, we installed NOMs-approved security gates to the new visiting area. The work was undertaken out of hours.

Project Summary

HMP/YOI Feltham

Project – Legal safe booths

Duration – Commenced from April 2020 to June 2020.

Approx. value – £149,000

Project Details

Between April 2020 and June 2020, we installed legal safe booths at HMP/YOI Feltham for the provision of legal visits at a cost of £149,000.

 

We conducted the following works as part of the project: –

  • Formed and constructed individual acoustic legal safe booths.
  • Upgraded the seating area.
  • Made alterations to the existing CCTV.
  • Insulated general alarms.
  • Installed new lighting and suspended ceiling tiles.

Project Summary

HMP/ YOI Feltham 

Project – Refurbishment of Showers, Wings and Servery at HMP

Duration – Between March 2020 and May 2020

Approx. value – £148,000

Project Details

Between March 2020 and May 2020, we undertook a wing, shower, and servery refurbishment project at HMP Feltham at a cost of £148,000.

 

We conducted the following works as part of the project: –

  • Decorated the main corridors.
  • Refurbished the servery – used white roc wall coverings throughout
  • Installed hygienic ceilings.
  • Installed new stainless-steel gullies.
  • Used TG69 resin floor covering.
  • Installed new stainless-steel sinks, drainers and bench tops and new Bain Marie cooking facilities.
  • Installed Insect-O-Cutors.
  • Installed new electrical LED lights.
  • Fitted all water pipes and services with shrouds.
  • Designed and installed a new extraction and intake ventilation scheme.
  • Completely redecorated the main association area and high-level walkways.

Project Summary

HMP/ YOI Feltham 

Project – ESU unit refurbishment 

Duration – Commenced from January 2020 to March 2020

Approx. value – £295,000.

Project Details

Between January 2020 and March 2020, we undertook an ESU unit refurbishment at HMYOI Feltham at a cost of £295,000.

 

We have conducted the following works as part of the project: –

  • Installed new specialist furniture.
  • Laid new vinyl flooring throughout.
  • Decorated throughout the unit.
  • Installed new LED lighting.
  • Upgraded the servery.
  • Upgraded the wing showers.
  • Updated the current CCTV.

Project Summary

HMP/ YOI Feltham 

Project – Legal and close visits at HMP

Duration – Commenced December 2019

Approx. value – £115,000

Project Details

Between December 2019 and March 2020, we completed legal and closed visits at HMYOI Feltham at a cost of £115,000.

 

The visits were undertaken out of hours and at weekends to keep the establishment’s areas live and operational.

 

We have conducted the following works as part of the project: –

  • Installed new suspended ceilings.
  • Laid new vinyl flooring.
  • Decorated throughout.
  • Added acoustic wall and ceiling linings.
  • Installed new CCTV.

Project Summary

HMP/ YOI Feltham 

Project – Shower refurbishment

Duration – Commenced from April 2019 to June 2019

Approx. value – £290,000

Project Details

Between April 2019 and June 2019, we created 2 new showers at HMP Feltham for the MoJ at a cost of £107,000.

 

We conducted the following works as part of the project: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Installed new resin floor coverings.
  • Used new hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed new electrical LED lights.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Wormwood Scrubs 

Project – Shower refurbishment

Duration – Between January 2020 and June 2020

Approx. value – £610,000

Project Details

Between January 2020 and June 2020, we undertook the first phase of installing 5 new showers at HMP Wormwood Scrubs at a cost of £610,000.

 

We conducted the following works as part of the project: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Installed new resin floor coverings.
  • Used new hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed new electrical LED lights.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Whitemoor 

Project – D1 shower 

Duration – Commenced January 2020 for a period of 8 weeks.

Approx. value – £79,000

Project Details

Between January 2020 and March 2020, we installed a D1 shower at HMP Whitemoor at a cost of £79,000.

 

We conducted the following works as part of the project:-

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Installed new resin floor coverings.
  • Used new hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Wandsworth 

Project – Shower Instalment

Duration – Commenced June 2019 to August 2019

Approx. value – £115,000

Project Details

Between June 2019 and August 2019, we created 2 new showers at HMP Wandsworth for GFSL at a cost of £115,000.

 

We conducted the following works as part of the project: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Installed new resin floor coverings.
  • Used new hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Project Summary

HMP Wormwood Scrubs

Project – Shower Instalment

Duration – Between May 2019 and July 2019

Approx. value – £99,000

Project Details

Between May 2019 and July 2019, we created 2 new showers at HMP Wormwood Scrubs for GFSL at a cost of £99,000.

 

We conducted the following refurbishment works: –

  • Stripped out and isolated redundant services fixtures and fittings.
  • Installed new stainless steel aco drains.
  • Installed resilient porcelain wall tiles.
  • Installed new resin floor coverings.
  • Used new hygienic ceiling linings.
  • Installed stainless steel shower cubicles.
  • Installed Trespa privacy wall panels.
  • Installed new LED lighting.
  • Installed extract and intake ventilation grills and new stainless-steel sluice sinks.

Want to discuss your requirements?

Contact us today to find out how we at PMA (Services) Ltd can help you.

WordPress Lightbox