HMP Standford Hill

Between February 2021 and May 2021, we installed 64 Nr sleeper units at HMP Standford Hill for GFSL at a cost of £2.9 million.

Details:

We installed 64 MUDR permanent sleeper units

 

The auxiliary units included double servery, double self-cook, double office and WC, single laundry, single pin phone and store units

 

We also upgraded 20 Nr temporary Covid-19 sleepers into permanent placement arrangements

As part of the project we:

  • Installed automated gate entry
  • Installed hardwired fire alarms
  • Installed CCTV throughout
  • Installed digital TV to all sleeper units
  • Installed permanent power and linked all underground services to the main sewer

HMP Ford

Between February 2021 and April 2021, we installed 80 Nr sleeper units at HMP Ford for GFSL at a cost of £2.6 million.

Details:

We installed 80 permanent sleepers, 4 ambulant accessible sleepers, 2 single kitchens, 2 single laundries, and 2 single pin phones.

As part of the project we:

  • Installed CCTV and external lighting throughout
  • Connected the underground drainage to the main sewer
  • Installed digital TV
  • Installed hardwire fixed fire alarms
  • Undertook extensive external landscaping

HMP Wandsworth

Between March 2020 and June 2020, we installed 2 Nr safety cells at HMP Wandsworth for GFSL at a cost of £210,000.

Details:

We altered and adapted the existing standard cells into compliant safer cells.

As part of the project we:

  • Installed safer cells Corian beds and Corian WCs and basins
  • Installed NOMS-approved safer cell windows
  • Installed anti-ligature cell door shrouds to all exposed pipework to ensure that the cells are anti-ligature compliant
  • Fitted safer cells face plates to cell core and light switches
  • Installed anti-leg safer cell replacement light fittings
  • Used resin floor coverings
  • Decorated the walls and ceilings

HMP/YOI East Sutton Park

Between June 2020 and September 2020, we installed temporary accommodation portacabins at HMP East Sutton Park at a cost of £250,000.

Details:

In response to the Covid-19 outbreak the MoJ sourced and purchased a number of individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

As part of the project we:

  • Installed temporary generators to provide power
  • Provided water and waste water connections
  • Installed external lighting
  • Fitted the sleeper accommodation with bedding, furniture and desks

HMP The Verne

Between June 2020 and September 2020, we installed temporary accommodation portacabins at HMP The Verne at a cost of £189,000.

Details:

In response to the Covid-19 outbreak the MoJ sourced and purchased a number of individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

As part of the project we:

  • Installed temporary generators to provide power
  • Provided water and waste water connections
  • Installed external lighting
  • Fitted the sleeper accommodation with bedding, furniture and desks

HMP Huntercombe

Between June 2020 and September 2020, we installed temporary accommodation portacabins at HMP Huntercombe at a cost of £155,000.

Details:

In response to the Covid-19 outbreak the MoJ sourced and purchased a number of individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

As part of the project we:

  • Installed temporary generators to provide power
  • Provided water and waste water connections
  • Installed external lighting
  • Fitted the sleeper accommodation with bedding, furniture and desks

HMP Guys Marsh

Between June 2020 and September 2020, we installed temporary accommodation portacabins at HMP Guys Marsh at a cost of £217,000.

Details:

In response to the Covid-19 outbreak the MoJ sourced and purchased a number of individual portacabins and asked us to place them in a temporary designated location. The idea was to provide isolation areas to help manage and contain the Covid outbreak there.

As part of the project we:

  • Installed temporary generators to provide power
  • Provided water and waste water connections
  • Installed external lighting
  • Fitted the sleeper accommodation with bedding, furniture and desks

HMP Birmingham

Between January and March 2020, we completed a health care dental project at HMP Birmingham at a cost of £210,000.

Details:

The project was a sensitive one and the work was carried out at weekends. We altered and adapted an existing office; converting the area into an NHS-compliant dentist in-establishment facility.

As part of the project we:

  • Installed an NHS-compliant ventilation and comfort cooling system
  • Installed hygienic wall and floor finishes
  • Installed a bespoke dental chair
  • Installed Corian hygienic NHS standard worktop and cabinets
  • Installed new water and dental compressed air services
  • Upgraded the electrical services to accommodate an X-ray machine

HMP Wormwood Scrubs

Between January and March 2020, we undertook an adapted equality cell conversion and holding room alteration at HMP Wormwood Scrubs at a cost of £138,000.

Details:

There was a tight deadline with this project and we were awarded it with five weeks to go until the year-end. It was successfully completed on time.

As part of the project we:

  • Altered and adapted 2 existing standard cells
  • Widened the cell entrance doors to comply with the Equality Act standards
  • Levelled the floors
  • Converted 1 cell into an accessible wet area and WC
  • Installed new cell call and accessible alarm systems
  • Installed new accessible bed and furniture

HMP Birmingham

In December 2019, we adapted wing offices into healthcare areas at HMP Birmingham for AMEY PLC at a cost of £98,000.

Details:

We were contracted to alter and adapt a number of existing wing offices to convert them into healthcare and medicine dispensing areas. As the work was undertaken on a live wing, we also carried out weekend work to speed up the project.

As part of the project we:

  • Designed, fabricated, and installed bespoke secure medical serving hatches
  • Installed new hygienic cabinets and worktops
  • Installed new hygienic floors, walls, and ceiling
  • Upgraded the lighting system to comply with medical regulations

HMP Birmingham

Between May 2019 and October 2019, we undertook an extension to the CSU wing at HMP Birmingham for the MoJ at a cost of £350,000.

Details:

The work was undertaken in a live environment and included out of hours and weekend work. It involved installing security hoardings to facilitate the work.

As part of the project we:

  • Undertook extensive cell refurbishment
  • Installed new cell doors
  • Installed 2 new wing showers
  • Removed a structural staircase
  • Installed a new secure mesh ceiling
  • Laid new vinyl flooring throughout main association area
  • Upgraded staff mess room
  • Upgraded wing CCTV
  • Introduced new GA buttons

HMP Send

Between March 2019 and May 2019, we undertook the refurbishment of a mess cafe at HMP Send for the MoJ at a cost of £124,000.

Details:

The area had been used previously as an officers’ social club and it was isolated, cleaned, and stripped before being refurbished.

As part of the project we:

  • Laid vinyl and carpet throughout
  • Decorated throughout
  • Formed a new hygienic kitchen area
  • Upgraded the LED lighting system
  • Altered male, female and DDA toilets
  • Installed new kitchen cabinets

HMP Winchester

Between August 2019 and September 2019, we undertook the reinstatement of Wing B at HMP Winchester for HMP at a cost of £150,000.

Details:

We were asked to go on-site to assess the general damage to the wing following a disturbance.

As part of the project we:

  • Completely cleaned the wing and stripped it back to its original state
  • Made structural repairs
  • Introduced mesh and render finishings
  • Repaired brickwork
  • Redecorated throughout

HMP Wormwood Scrubs

Between November 2019 and January 2020, we reinstated NOMS-approved secure and compliant security ceilings at HMP Wormwood Scrubs for GFSL at a cost of £68,000.

Details:

During a routine survey it was discovered that the ceilings were non-compliant and provided a security breach problem. We installed NOMS-approved secure and compliant ceilings out of hours to keep the area in operation.

HMP Wandsworth

Between October 2020 and January 2021, we undertook seg reinstatements work at HMP Wandsworth for GFSL at a cost of £70,000.

As part of the project we:

  • Decorated cells
  • Upgraded lighting
  • Laid new vinyl flooring
  • Used anti pick mastic joint sealant throughout
  • Installed heating pipe shrouds
  • Installed new furniture throughout all cells
  • Carried out a refurbishment to specialist holding and search cells
  • Carried out a part refurbishment of the shower area to ensure hygiene standards

HMP Wormwood Scrubs

Between September 2020 and March 2021, we installed 5 Nr showers at HMP Wormwood Scrubs for GFSL at a cost of £220,000.

As part of the project we:

  • Isolated services
  • Stripped out redundant fixtures and fittings where needed
  • Laid new resin floors
  • Installed new stainless steel aco drains
  • Installed new LED lighting
  • Installed new Trespa cubicle panels, stainless steel cubicles and new Rada showers
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP/YOI Chelmsford

Between August 2018 and January 2019, we undertook 38 cell refurbishments at HMP Chelmsford for the MoJ at a cost of £300,000.

As part of the project we:

  • Isolated services
  • Stripped away all of the vinyl flooring
  • Removed furniture
  • Repaired windows, electrical lights and cell calls that were in a state of disrepair
  • Refurbished the wing shower
  • Laid new vinyl flooring throughout
  • Decorated cells, walls, and ceilings as well as the main landing and association area
  • Carried out a deep clean throughout

HMP Wandsworth

Between January 2020 and June 2020, we undertook 5 Nr shower refurbishments at HMP Wandsworth for GFSL at a cost of £300,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains and resilient porcelain wall tiles
  • Used new resin floor coverings and hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Rochester

Between November 2018 and January 2019, we undertook the refurbishment of a high-spec shower at HMP Rochester for the MoJ at a cost of £89,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Laid new resin flooring
  • Installed hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Wormwood Scrubs

Between January 2020 and June 2020, we undertook 2 Nr shower refurbishments at HMP Wormwood Scrubs for GFSL at a cost of £110,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Used new resin floor covering and hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP/YOI Brinsford

Between February 2019 and April 2019, we created 2 new shower rooms at HMP Brinsford for the MoJ at a cost of £125,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Used new resin floor covering and hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Wandsworth

Between November 2018 and January 2019, we created a new equalities act compliant accessible shower at HMP Wandsworth for the MoJ at a cost of £45,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Laid new resin flooring
  • Installed hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP/YOI Feltham

Between April 2020 and June 2020, we altered and adapted an existing wing at HMP/YOI Feltham for GFSL to make it suitable for use as an ESU wing at a cost of £159,000.

As part of the project we:

  • Redecorated individual cells
  • Installed electro-chromatic doors
  • Upgraded association areas
  • Refurbished wing offices
  • Upgraded and refurbished wing showers

HMP Wormwood Scrubs

Between December 2018 and February 2019, we installed new specialist security gates at HMP Wormwood Scrubs for the MoJ at a cost of £30,000.

 

As part of the project we installed NOMs-approved security gates to the new visiting area. The work was undertaken out of hours.

HMP/YOI Feltham

Between April 2020 and June 2020, we installed legal safe booths at HMP/YOI Feltham for the provision of legal visits at a cost of £149,000

As part of the project we:

  • Formed and constructed individual acoustic legal safe booths
  • Upgraded the seating area
  • Made alterations to the existing CCTV
  • Insulated general alarms
  • Installed new lighting and suspended ceiling tiles

HMP/YOI Feltham

Between March 2020 and May 2020, we undertook a wing, shower, and servery refurbishment project at HMP Feltham at a cost of £148,000.

As part of the project we:

  • Completely redecorated the main association area and high-level walkways
  • Decorated the main corridors
  • Refurbished the servery – used white roc wall coverings throughout
  • Installed hygienic ceilings
  • Installed new stainless steel gullies
  • Used TG69 resin floor covering
  • Installed new stainless steel sinks, drainers and bench tops and new Bain Marie cooking facilities
  • Installed Insect-O-Cutors
  • Installed new electrical LED lights
  • Fitted all water pipes and services with shrouds
  • Designed and installed a new extraction and intake ventilation scheme

HMP/YOI Feltham

Between January 2020 and March 2020, we undertook an ESU unit refurbishment at HMYOI Feltham at a cost of £295,000.

As part of the project we:

  • Installed new specialist furniture
  • Laid new vinyl flooring throughout
  • Decorated throughout the unit
  • Installed new LED lighting
  • Upgraded the servery
  • Upgraded the wing showers
  • Updated the current CCTV

HMP/YOI Feltham

Between December 2019 and March 2020, we completed legal and closed visits at HMYOI Feltham at a cost of £115,000.

 

The visits were undertaken out of hours and at weekends to keep the establishment’s areas live and operational.

The purpose of the project was to complete a new visiting area. We:

  • Installed new suspended ceilings
  • Laid new vinyl flooring
  • Decorated throughout
  • Added acoustic wall and ceiling linings
  • Installed new CCTV

HMP/YOI Feltham

Between April 2019 and June 2019, we created 2 new showers at HMP Feltham for the MoJ  at a cost of £107,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Installed new resin floor coverings
  • Used new hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed new electrical LED lights
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Wormword Scrubs

Between January 2020 and June 2020, we undertook the first phase of installing 5 new showers at HMP Wormword Scrubs at a cost of £610,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Installed new resin floor coverings
  • Used new hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed new electrical LED lights
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Whitemoor

Between January 2020 and March 2020, we installed a D1 shower at HMP Whitemoor at a cost of £79,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Installed new resin floor coverings
  • Used new hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Wandsworth

Between June 2019 and August 2019, we created 2 new showers at HMP Wandsworth for GFSL at a cost of £115,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Installed new resin floor coverings
  • Used new hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Wormwood Scrubs

Between May 2019 and July 2019, we created 2 new showers at HMP Wormwood Scrubs for GFSL at a cost of £99,000.

As part of the project we:

  • Stripped out and isolated redundant services fixtures and fittings
  • Installed new stainless steel aco drains
  • Installed resilient porcelain wall tiles
  • Installed new resin floor coverings
  • Used new hygienic ceiling linings
  • Installed stainless steel shower cubicles
  • Installed Trespa privacy wall panels
  • Installed new LED lighting
  • Installed extract and intake ventilation grills and new stainless steel sluice sinks

HMP Wormwood Scrubs

Between July 2018 and December 2018, we undertook 104 cell wing refurbishments at HMP Wormwood Scrubs for the MoJ at a cost of £475,000.

As part of the project we:

  • Isolated all of the services
  • Stripped away all of the vinyl flooring
  • Removed furniture
  • Repaired windows, electrical lights and cell calls that were in a state of disrepair
  • Refurbished the wing shower
  • Laid new vinyl flooring throughout
  • Decorated cells, walls, and ceilings as well as the main landing and association area
  • Carried out a deep clean throughout

Want to discuss your requirements?